Resources

Clearer records. Better questions.

Practical guidance for the teams capturing, reviewing and operating network information.

Workflow guides

Follow the context.

6 guides

01

KML vs KMZ: choosing a network survey export

Understand the difference between KML and its packaged KMZ form, and what to check before sharing a mapped network route.

Read guide ↗
02

A practical route kilometre survey workflow

Keep route identification, geo-tagged capture, measurement review and execution handoff connected throughout a network survey.

Read guide ↗
03

Planned vs executed RKM: reviewing the difference

Compare route measurements at the right level, keeping surveyed, executed and commissioned lengths distinct during rollout review.

Read guide ↗
04

Active vs passive network inventory

Understand how physical network infrastructure and installed equipment connect to routes, sites and handover records.

Read guide ↗
05

From a mapped fault stretch to a field response

Connect fault location, team proximity, assignment and closure without confusing a map location with an entire dispatch decision.

Read guide ↗
06

How to choose GIS for network rollout and operations

Evaluate the handoffs between survey, documentation, delivery and operations, alongside data and integration requirements.

Read guide ↗

Glossary

A common language
for connected work.

Definitions grounded in the network workflow. Start with the term, then explore the task it supports.

01

GIS: geographic information systems

GIS connects geographic information with records and workflows so people can understand places, relationships and the work associated with them.

Read definition ↗
02

Network POP records

POP-wise records bring together network site assets and capacity, keeping the site context available across inventory and delivery workflows.

Read definition ↗
03

RKM: route kilometre

Route kilometre is a route-distance measure used in survey, mapping and execution reconciliation. Its meaning depends on the scope and stage of work.

Read definition ↗
04

I&C: installation and commissioning

Installation and commissioning connects site-level status, test records and asset-linked handover documents before operational use.

Read definition ↗
05

RFMS: route and fault management

Lumacorp uses RFMS for Route and Fault Management: locating fault stretches on the map and identifying nearby field teams.

Read definition ↗
06

WFMS: work force management

Work Force Management connects field tickets, assignment, reassignment, closure, location-based dispatch and daily reports.

Read definition ↗

Your network. Your next step.

See the workflow
with your project in mind.

Tell us what you need to capture, deliver or operate. We’ll start with the workflow that matters to you.

Book a demo